Browse by author
Lookup NU author(s): Professor Paul Younger
Full text for this publication is not currently held within this repository. Alternative links are provided below where available.
Deep mining activity has totally ceased in the Durham coalfield, and withdrawal of the regional dewatering scheme is being contemplated. Consequent groundwater rebound is expected to have severe and expensive environmental consequences, which could only be entirely avoided through indefinite pumping. However, continued pumping is expensive, at about pound 1 million/annum. The options of either abandoning or continuing pumping have differing time streams of future costs and, consequently, direct comparison of the expenditures involved is difficult. Both options are therefore analysed using economic evaluation criteria in order to determine the lowest cost alternative for the future. The overall outcome of the economic analysis, using both net present value and equivalent annual cost criteria, demonstrates that the option of continued pumping is less expensive than the option of abandoning pumping in all cases.
Author(s): Younger PL, Harbourne KJ
Publication type: Article
Publication status: Published
Journal: Journal of the Chartered Institution of Water and Environmental Management
Year: 1995
Volume: 9
Issue: 4
Pages: 405-415
Print publication date: 01/08/1995
ISSN (print): 1747-6585
ISSN (electronic): 1747-6593
Publisher: Wiley-Blackwell Publishing Ltd.
URL: http://dx.doi.org/10.1111/j.1747-6593.1995.tb00958.x
DOI: 10.1111/j.1747-6593.1995.tb00958.x
Altmetrics provided by Altmetric